MCOR Power Quality
Meter PQ ReportStanger-Groutville Phase1 (33KV)
Doc No:MCOR-PQ-0009
Document Ref:MCOR-PQ-2026-Q2
Period:2026-04-01 to 2026-06-30
Generated2026-06-26 11:57:15 SAST
Meter Serial: 10266107
Site: Kwadukuza Municipality
Feeder: 4
Area: Stanger Substation
Last Reading: 2026-06-26 11:55
Quarter: Q2 2026

10.3   Voltage Compliance

ParameterNERSA LimitMeasuredStatus
Voltage PQ Events (threshold log)≤ 40 / quarter16 eventsCompliant
Power Failures / Outages≤ 20 / quarter8 eventsCompliant
Voltage Unbalance≤ 2%7.31%Non-Compliant
Flicker Pst (short-term)≤ 1.0Max 0.00Compliant
Flicker Plt (long-term)≤ 0.80.00Compliant

10.4   Harmonic Distortion

ParameterNERSA LimitL1L2L3Status
THD Voltage (VTHD)≤ 5% 0.8%1.5%1.1% Compliant
3rd Harmonic (V)Review 0.7%1.3%1.0% Compliant
5th Harmonic (V)≤ 3% 0.2%0.3%0.4% Compliant
7th Harmonic (V)≤ 3% 0.1%0.2%0.1% Compliant

10.5   Loading & Power Factor

ParameterL1L2L3Value
Voltage (V)19653.0V19182.0V20631.0VUnbal: 7.31%
Current (A)224.000A232.800A226.400A
Active PowerTotal: 12340.800 kWPF: 0.924
Frequency50.120 HzCompliant

10.6   PQ Event Summary (2026-04-01 to 2026-06-30)

Event TypeCountSeverityNotes
Voltage PQ Threshold Events16InvestigateDLMS event log codes 210-213
Power Failures / Outages8InvestigatePower fail log entries
Power Cycle Events1473InvestigateCodes 1 & 2
Harmonic Exceedances (H5/H7)0LowAll within limit

10.7   Compliance Summary

MetricTargetActualStatus
VTHD Compliance≤ 5%1.5%Compliant
Voltage Unbalance≤ 2%7.31%Non-Compliant
PQ Threshold Events≤ 40 / quarter16Compliant
Outages≤ 20 / quarter8Compliant
Harmonic Incidents (H5/H7)≤ 100Within Limit