MCOR Power Quality
Meter PQ ReportStanger-Sappi Feed 2 (33KV)
Doc No:MCOR-PQ-0008
Document Ref:MCOR-PQ-2026-Q2
Period:2026-04-01 to 2026-06-30
Generated2026-06-23 09:19:59 SAST
Meter Serial: 10266105
Site: Kwadukuza Municipality
Feeder: 6
Area: Stanger Substation
Last Reading: 2026-06-23 09:18
Quarter: Q2 2026

10.3   Voltage Compliance

ParameterNERSA LimitMeasuredStatus
Voltage PQ Events (threshold log)≤ 40 / quarter30 eventsCompliant
Power Failures / Outages≤ 20 / quarter0 eventsCompliant
Voltage Unbalance≤ 2%1.42%Compliant
Flicker Pst (short-term)≤ 1.0Max 0.00Compliant
Flicker Plt (long-term)≤ 0.80.00Compliant

10.4   Harmonic Distortion

ParameterNERSA LimitL1L2L3Status
THD Voltage (VTHD)≤ 5% 0.5%0.8%0.5% Compliant
3rd Harmonic (V)Review 0.2%0.6%0.1% Compliant
5th Harmonic (V)≤ 3% 0.3%0.3%0.3% Compliant
7th Harmonic (V)≤ 3% 0.0%0.0%0.1% Compliant

10.5   Loading & Power Factor

ParameterL1L2L3Value
Voltage (V)19527.0V19776.0V19806.0VUnbal: 1.42%
Current (A)142.500A148.500A136.500A
Active PowerTotal: 8364.000 kWPF: 0.983
Frequency50.110 HzCompliant

10.6   PQ Event Summary (2026-04-01 to 2026-06-30)

Event TypeCountSeverityNotes
Voltage PQ Threshold Events30InvestigateDLMS event log codes 210-213
Power Failures / Outages0LowPower fail log entries
Power Cycle Events20InvestigateCodes 1 & 2
Harmonic Exceedances (H5/H7)0LowAll within limit

10.7   Compliance Summary

MetricTargetActualStatus
VTHD Compliance≤ 5%0.8%Compliant
Voltage Unbalance≤ 2%1.42%Compliant
PQ Threshold Events≤ 40 / quarter30Compliant
Outages≤ 20 / quarter0Compliant
Harmonic Incidents (H5/H7)≤ 100Within Limit