Meter PQ ReportStanger-Feeder 1 (33KV)
Doc No:MCOR-PQ-0002
Document Ref:MCOR-PQ-2026-Q2
Period:2026-04-01 to 2026-06-30
Generated2026-07-04 10:39:35 SAST
Meter Serial: 10266103
Site: Kwadukuza Municipality
Feeder: 1
Area: Stanger Substation
Last Reading: 2026-07-04 10:30
Quarter: Q2 2026

10.3   Voltage Compliance

ParameterNERSA LimitMeasuredStatus
Voltage PQ Events (threshold log)≤ 40 / quarter35 eventsCompliant
Power Failures / Outages≤ 20 / quarter14 eventsCompliant
Voltage Unbalance≤ 2%1.23%Compliant
Flicker Pst (short-term)≤ 1.0Max 0.00Compliant
Flicker Plt (long-term)≤ 0.80.00Compliant

10.4   Harmonic Distortion

ParameterNERSA LimitL1L2L3Status
THD Voltage (VTHD)≤ 5% 0.3%0.8%0.4% Compliant
3rd Harmonic (V)Review 0.0%0.6%0.2% Compliant
5th Harmonic (V)≤ 3% 0.2%0.3%0.3% Compliant
7th Harmonic (V)≤ 3% 0.1%0.1%0.0% Compliant

10.5   Loading & Power Factor

ParameterL1L2L3Value
Voltage (V)19623.0V19797.0V19866.0VUnbal: 1.23%
Current (A)42.000A42.000A42.000A
Active PowerTotal: 2439.000 kWPF: 0.986
Frequency49.960 HzCompliant

10.6   PQ Event Summary (2026-04-01 to 2026-06-30)

Event TypeCountSeverityNotes
Voltage PQ Threshold Events35InvestigateDLMS event log codes 210-213
Power Failures / Outages14InvestigatePower fail log entries
Power Cycle Events1519InvestigateCodes 1 & 2
Harmonic Exceedances (H5/H7)0LowAll within limit

10.7   Compliance Summary

MetricTargetActualStatus
VTHD Compliance≤ 5%0.8%Compliant
Voltage Unbalance≤ 2%1.23%Compliant
PQ Threshold Events≤ 40 / quarter35Compliant
Outages≤ 20 / quarter14Compliant
Harmonic Incidents (H5/H7)≤ 100Within Limit